California State Legislature Assemblywoman Diane Harkey


Quick Background: Assemblywoman Harkey, and State Senator Doug LaMalfa, have been the most outspoken critical legislators in Sacramento, proposing several pieces of legisation with the intention of terminating the California High-Speed Rail Project. 

Being in the Republican minority (in both Houses), their voices falls on deaf ears among the majority Democrats who, pressured by Governor Jerry Brown, continue to support a project that has lost majority support among the voters, and continues to be exposed as totally mismanaged and fraudulent, as well as illegal on many counts. 

Here are Ms. Harkey's responses to an article that recently appeared in several northern California newspapers. What the Assemblywoman is doing here is providing a context for the high-speed rail project, and that is the state's deplorable economy.  

The Democratic "folk wisdom" holds that projects such as HSR will pump resources, especially from outside of the state such as the DOT's promise of $3.3 billion, into the state economy, thereby reducing deficit and debt, as well as creating jobs.  That could very well be the case if those dollars were devoted to infrastructure repair and upgrades, including urban and regional public mass transit reorganization and improvement.

However, for a project of such low merit -- so unnecessary and so dazzlingly expensive -- all the available dollars will only scratch the surface of those enormous costs of this project, which will go unfinished.  And that results in an enormous waste which will accomplish none of the purported goals and intentions. 
=======================================

The Other Side - Rebuttal to High-Speed Rail: By The Numbers
As Published in the San Jose Mercury News and Contra Costa Times on 06/08/2012
By Assemblywoman Diane Harkey
June 11, 2012

The article states, "Plans for a high-speed rail system snaking up the spine of California have the project pegged as the state's costliest ever. Lots of numbers follow a price tag that big." However, the numbers have a few caveats and are questionable as noted below:

$69 billion: Project's projected cost over decades. This number is fairy dust to make the plan more palatable.  The new business plan states that for full build out it would require $91.5 billion and that is without the LA to Anaheim route which was recently added and definitely will include eminent domain and other issues.

$91.4 billion: Proposed 2012-13 state budget. Don't forget that the budget is minus the realignment funds of $5-6 billion that were part of the General Fund prior to 2011-12 budget (the "catch and release" program for state prisoners). As an aside, CCPOA (the prison guards) are hiring more people not less at the state level, even though the prison count is down due to realignment or relieving overcrowding issues by sending state prisoners to the county jails.

$15.7 billion: Estimated state budget deficit. This figure does not include the state's structural budget deficit of $35 billion that is cash flow fudging via borrowing and deferring school funding as well as internal borrowing from over 700 state accounts.  In addition, our long term bond debt of $90 billion has grown from $57 billion since 2007.  Our bankers are demanding trigger cuts because we have nowhere left to go for current cash flow.  We borrowed $6-7 billion in Revenue Anticipation Notes (short-term bonds) that must show 1.8 x cash flow coverage plus be paid off annually before renewing.  This is why the triggers were demanded, not because the Legislature or the Governor is volunteering to reduce state spending.

$36 million: Project's projected 2012-13 budget cost. What will it be next year? If we build a stranded project and wait for a few years to continue will the strip in the Central Valley pay for itself? Elusive cap and trade revenues cannot be used as by law they are to be used to reduce greenhouse gas (GHG) emissions by 2020. The revised 4th business plan calls for build-out by 2038. In the meantime, and if the ridership is less than projected, high-speed rail will be a net GHG emitter.

$750 million: Annual amount, on average, that the project could cost the state budget over 30 years.   Assumes we will only be indebted for the $9.95 voter approved bond debt.  What if we need to borrow more or ridership is not what the plan assumes? The Legislative Analyst claims we could see operating costs of $1 billion or more per year.

11,000: Number of public school teachers' current salaries that amount could pay a year - more with operating costs.

$3.3 billion: Federal grants tagged for project's construction - earmarked for the Central Valley and must be spent by September 2017, and matched by state funds of $2.7 billion.  Estimates are that the state will have to burn through $3.5 million per day (holidays and weekends included) to meet the Fed deadline. Is it worth nuking CEQA and setting a precedent?  Why not ask the President to give us a break on the $10 billion we owe for unemployment insurance that will eventually increase the premium on remaining employers? 

$3.7 billion: Amount Gov. Jerry Brown is asking lawmakers to spend in state bonds to start the overall project.  I believe the number is $2.7 billion. [Plus another billion for the "bookends."]

$1.3 billion: Amount of debt payments, including interest, the state would be on the hook for if the project got the ax today.  So we need to continue until build out? What would the cost be if we had to access unconventional debt, if we can't get bonds because we are tapped out as we are today? Does anyone really believe the rest of the nation will pick up the tab for California to build a train? 

$9.5 billion: State taxpayer burden if funding dries up after first segment of track is built. This assumes that the CHSRA can access all of the debt for Phase 1. Bond restrictions require not more than 50% of the cost for each corridor or useable segment thereof  to be Prop 1A bond money, so where are the remaking funds coming from? Also does this figure account for the loss to the state in jobs and human services for the Central Valley Agricultural community, and other businesses that will be decimated during construction?

$22.5 billion: Amount in debt the state would be responsible for if entire project is built. If there is one thing we can all agree upon it is that the CHSRA lacks credibility at this juncture.  Why should we accept these numbers when we don't have an accurate ridership study, true cost analysis or future funding sources lined up?

$42 billion: Highest amount of additional federal funding being hoped for. This lacks credibility.

$13 billion: Amount of private investments being hoped for.  Which we will not see if we begin in the Central Valley.

520: Length, in miles, of line from San Francisco to Los Angeles as originally approved by voters. Voters approved 800 miles from San Francisco to San Diego, for a cost of $45 billion.


Sunday, June 10, 2012

We don't need no edukatin'. We have got high-speed rail comin'.



•The California budget is a zero-sum game. Every dollar spent on HSR is not available for education.

•Education produces the state's "seed corn" for its economy. Lousy Education = Lousy Economy.

•Any macro-economist will tell you that the most important natural resource a nation or state can have is its educated population.  Without that, it's a third-world nation.   

•There are open jobs available in California but an insufficiently qualified work-force to fill those jobs.  What's missing? Education.  There are no new jobs for the un-educated or under-educated, un-trained or under-trained.

•This state once had the best -- the very best -- public education system in the US, from pre-K to graduate school.  That education system provided the brain-power/labor-force for Silicon Valley.  Silicon Valley has been California's economic engine.  You don't need to read the rest of this syllogism; you already know it. 

•Governor Brown is telling all the voters in California who put him into office, "Screw your future!  I'm only interested in the next four quarters."  That's his "hard decision." 

•The HSR advocates have it backwards. They contend that a high-speed train will stimulate a dynamic economy. A high-speed rail system will not create a dynamic economy.  Only an already dynamic economy can afford the luxury of a high-speed train.  See Spain as the latest failed economy with a high-speed train. 

•Silicon Valley is a great example of a dynamic economy.  Any "Silicon Valley" is only possible with a highly educated population. Therefore. . . . 


Wednesday, June 6, 2012

Release of California Rail Bonds may be ruled illegal: by Mark Powell



RELEASE OF CALIFORNIA RAIL BONDS MAY BE RULED ILLEGAL

POSTED ON JUNE 6, 2012 
BY MARK POWELL

An Argument Against the California Legislature’s Release of $2.7 Billion in Proposition 1A Rail Bonds

As a safeguard against what might be termed a “stranded investment”, the Californian High Speed Rail Authority is required to submit to the legislature (and other parties) a “detailed funding plan for the corridor or usable segment thereof”, for which they are seeking state bond funds [Note 1].

AB 3034 section 2704.01 paragraphs (d) through (g) define important terms:
(d) “High-speed train” means a passenger train capable of sustained revenue operating speeds of at least 200 miles per hour where conditions permit those speeds.
(e) “High-speed train system” means a system with high-speed trains and includes, but is not limited to, the following components: right-of-way, track, power system, rolling stock, stations, and
associated facilities.
(f) “Corridor” means a portion of the high-speed train system as described in Section 2704.04.
(g) “Usable segment” means a portion of a corridor that includes at least two stations.

In their Draft 1012 Business Plan released in November 2011 the Authority proposed building an “Initial Construction Segment” (ICS) in the Central Valley using roughly $3.3 billion in federal funds and $2.7 billion in state rail bonds.  The proposed ICS was not to be electrified and there was to be no high-speed rolling stock.  In other words, it would not be ready for high-speed train service when completed. Opponents of high-speed rail saw the ICS as not meeting the requirements of a “usable segment” and the Authority seemed to implicitly agree with their opponents when releasing the Revised 2012 Business Plan the following April.  That plan deleted all references to an “Initial Construction Segment” and deleted the acronym ICS from the list of acronyms.  Instead the new plan referred to building “the First Construction of the Initial Operating Segment” in the Central Valley.

The Authority does have an adequate funding plan for their “First Construction of the Initial Operating Segment”.  It is guaranteed to be adequate because it involves building non-electrified track from approximately 1 mile north of Madera (probably on the BNSF alignment) south towards Bakersfield until they run out of money [Note 2]. However, it will be argued by opponents of HSR that the Authority needs a complete funding plan for its proposed Initial Operating Segment (IOS) extending from Merced to San Fernando (the first “useable segment”) and it will be argued that the current plan which relies on $21 billion in yet unauthorized federal support [Note 3], or Cap and Trade Funds as a “backstop” [Note 4] to the hoped for federal support, is certainly not adequate.  The opponent’s argument for the funding plan’s inadequacy is bolstered by the fact that neither the US Senate or House of Representatives has budgeted any funds for HSR for the foreseeable future and the California Legislative Analyst’s Office is on record stating that use of Cap and Trade fees would be inappropriate for a variety of reasons.

The federal government also seems concerned with making a stranded investment and federal grant wording  tries to protect federal taxpayers by stipulating that whatever is built with federal funds must have  “operational independence” [ Note 5]. Federal grant FR-HSR-0009-10-01-00 and its four subsequent amendments along with Federal grant FR-HSR-0118-12-01-00 [Note 6] provide funding for what they refer to as “the Project”.   The grant agreements define the Project as stretching south from approximately 1 mile north of Madera towards Bakersfield and the grant agreements mandate that $108 million of the federal grants be kept in an “Interim Use Reserve” to be used to connect the new stretch of track with existing rail infrastructure so that it would have “operational independence” if funds were not forthcoming to complete the Initial Operating Section (from Merced to San Fernando).  This requirement for an Interim Use Reserve seems to argue that not even the federal government sees the Authority has having a credible funding plan to complete the Initial Operating Segment.

A closer look at Proposition 1A funding plan requirements as well as federal funding plan requirements sheds more light on the weakness of the Authority’s funding plan.

Per Section 2704.08(c)(2) the funding plan required by Prop 1A for a “corridor” or “usable segment” is to certify to the following:
(A) The corridor, or usable segment thereof, in which the authority is proposing to invest bond proceeds.
(B) A description of the expected terms and conditions associated with any lease agreement or franchise agreement proposed to be entered into by the authority and any other party for the construction or operation of passenger train service along the corridor or usable segment thereof.
(C) The estimated full cost of constructing the corridor or usable segment thereof, including an estimate of cost escalation during construction and appropriate reserves for contingencies.
(D) The sources of all funds to be invested in the corridor, or usable segment thereof, and the anticipated time of receipt of those funds based on expected commitments, authorizations, agreements,
allocations, or other means.
(E) The projected ridership and operating revenue estimate based on projected high-speed passenger train operations on the corridor or usable segment.
(F) All known or foreseeable risks associated with the construction and operation of high-speed passenger train service along the corridor or usable segment thereof and the process and actions the authority will undertake to manage those risks.
(G) Construction of the corridor or usable segment thereof can be completed as proposed in the plan.
(H) The corridor or usable segment thereof would be suitable and ready for high-speed train operation.
(I) One or more passenger service providers can begin using the tracks or stations for passenger train service.
(J) The planned passenger service by the authority in the corridor or usable segment thereof will not require a local, state, or federal operating subsidy.
(K) The authority has completed all necessary project level environmental clearances necessary to proceed to construction.

Opponents will argue that a funding plan can only apply to a project that completes a “corridor” or “useable segment” (A) that will be “suitable and ready for high-speed train operation” (H).  The Initial Operating Segment from Merced to San Fernando could possibly meet these requirements, but the “First Construction of the Initial Operating Segment” or the “Project”, as this work is termed in the Federal Grants, cannot.  It can be argued that the current funding plan is lacking in other areas, but these two seem most critical.

In short, the executive branch of the federal government is anxious to give the Authority funds needed to build the Central Valley “Project”.  However, the law behind Proposition 1A, AB 3034, seems to dis-allow using bond proceeds for construction of the Project as defined in the Grant Agreements.  It can be argued that AB 3034 only allows for using bond proceeds to build a “corridor” or “useable segment” such as the complete Initial Operating Segment (Merced to San Fernando) and it can be argued the Authority’s funding plan for this work is grossly inadequate.

The California Legislature appears ready to release rail bonds to begin construction of “the Project” in the Central Valley in spite of the non-compliance of the Authority’s funding plan with the legislature’s own law, AB 3034.  These same lawmakers have skirted laws in the past. [Note 8] Specifically, AB 3034 mandated a grossly prejudicial wording for the November 2008 rail bond initiative ballot Title and Summary and disallowed the Attorney General’s Office from doing its duty to correct the prejudicial language as called for by the Political Reform Act of 1974.   The Attorney General in 2008, now our Governor and chief proponent of high speed rail, conspired with the legislature and allowed the lawlessness to proceed.  However, a suit was brought after the passage of “the Safe, Reliable, High-Speed Passenger Train Bond Act for the 21st Century” and the court ruled [Note 9] that the legislature did not have the right to disregard the law and dictate the Ballot Title and Summary for Proposition 1A.  Californians who now, knowing the truth about high-speed rail, oppose it by a strong margin [Note 10] can only hope that someone steps forward and successfully challenges the Legislature’s next act of lawlessness – release of the rail bonds in spite of a grossly adequate funding plan.

Factual statements made in this article are footnoted below and can be accessed by clicking on the link embedded in the article:

Note 1:  Assembly Bill 3034, section 2704.08.(c) (1)
http://www.leginfo.ca.gov/pub/07-08/bill/asm/ab_3001-3050/ab_3034_bill_20080826_chaptered.html
Note 2:  Grant Agreement FR-HSR-0118-12-01-00, Attachment 3, pages 11-12
http://www.cahighspeedrail.ca.gov/assets/0/152/281/a332a850-d7a6-4fda-8db4-bcfd28e47417.pdf
Note 3:  Revised 2012 Business Plan, Exhibit 7-10
http://www.cahighspeedrail.ca.gov/assets/0/152/431/3e11f55d-2ce4-42af-a734-a119f4c1f673.pdf
Note 4:  Revised 2012 Business Plan, page 7-1
http://www.cahighspeedrail.ca.gov/assets/0/152/431/3e11f55d-2ce4-42af-a734-a119f4c1f673.pdf
Note 5:  Federal grant FR-HSR-0009-10-01-00 as amended, Attachment 3A, Background and Key Assumptions section
http://www.cahighspeedrail.ca.gov/assets/0/152/281/985fcbd5-c406-4270-a7a8-ddcbd2b8854c.pdf
Note 6: Federal grant FR-HSR-0009-10-01-00 and its four subsequent amendments along with Federal Grant FR-HSR-0118-12-01-00
http://www.cahighspeedrail.ca.gov/funding.aspx
Note 8:  High Speed Railroading of the Public article
http://againstcaliforniahsr.com/uncategorized/high-speed-railroading-of-the-public
Note 9:  Howard Jarvis Taxpayers Association versus Bowen
http://www.leagle.com/xmlResult.aspx?xmldoc=In%20CACO%2020110127037.xml&docbase=CSLWAR3-2007-CURR
Note 10:  USC Dornsife/Los Angeles Times survey taken June 2, 2012
http://articles.latimes.com/2012/jun/02/local/la-me-0603-bullet-poll-20120604

Wednesday, May 30, 2012

CNN Video on the California High-Speed Rail Debacle


http://www.cnn.com/video/?hpt=hp_c1#/video/bestoftv/2012/05/30/ac-griffin-california-high-speed-rail.cnn

Bottom Line?  It's not about the train; it's about the money!   Your money!

Is it not yet clear to everyone in the United States that this project must be terminated?

It is not too late. Wait much longer and enormous permanent damage will be done to California.

The project, if it continues, will cost well above the various projected costs. All such projects do.

There will be very few, if any benefits to the people of California, except for the handful who stand to profit handsomely from the project.  This has been proven many times over.

The voters of this state have been, and continue to be, lied to by the rail project promoters. The project is in their self-interest.

The Governor and the Legislature will do nothing to prevent the $3.3 billion federal dollars from reaching California. That is their only interest in this project. 

##############
Kofi Annan is the former head of the United Nations and currently the envoy for the United Nations and the Arab League. He met with the Dictator of Syria who has been killing women and children to negotiate a truce and peace settlement. He has been unsuccessful.  This is what he had to say in an interview upon returning from Syria:

“I know it is stressful, there are lots of fears and threats, but people can find ways and means of making their feelings known, of getting the message around that we do not accept this; this is enough, no more violence, no more,” he said. “You can play a role in a way that perhaps you cannot imagine, but people and the population do have lots of power, and working together can do a lot.”

http://www.nytimes.com/2012/05/30/world/middleeast/kofi-annan-meets-with-bashar-al-assad.html?_r=1&ref=todayspaper

Our point here is not to compare the brutal violence and horrors of Syria with the high-speed rail project. 

Our point here is to take Mr. Annan's words about public protests and apply those to our high-speed rail situation in California.  

The must be a major public protest to stop the project.  When enough of our voters and tax-payers raise their voices in opposition to the train, it will come to an end.

Wednesday, May 9, 2012

Fellow Democrats, drop High-Speed Rail or you will deserve to lose this election


http://www.cnn.com/2012/05/08/opinion/carville-democrats-could-lose/index.html?hpt=hp_bn7

Carville is a guy to take very seriously. What does what he says have to do with HSR? Everything. If my fellow Democrats were really smart, they would dump this vision, this program and California's project like a hot potato.

HSR is not about or for "the rest of us." Most of those of us struggling in this economy with mortgage payments, debts, and insecure jobs or no jobs, don't give a damn about building this train for the rich.  We can't afford a vacation to Disneyland.  We don't commute between San Francisco and Los Angeles. High-Speed Rail is a project for other people, not us. We are never going to be spending the premium costs of these most expensive train tickets available. . . . . that is, if this project is actually ever completed.

Which now seems most unlikely. Yeah, it will start and they will spend as much of the $6 billion that they can, but after that, can you see $100 billion -- or anything like that much -- becoming available to be spent on a train that runs no farther than 400 miles north and south within California?

The project is, more than ever, a major political manipulation.  The Union bosses who are the actual decision-makers are using this project for the same propaganda purposes as the elected officials they seek to influence.  The regular Union guys who show up at meetings and hearings are paid to show up; they need the money.  Mostly it's Union/ Democratic Party member collusion.  The Union rank-and-file are getting screwed in this so-called deal.

We are driving fewer miles on the road.  We are not waiting to ride high-speed rail instead. The point is we are travelling less. It costs to travel, even if the transit costs themselves were low -- which on costly HSR they certainly aren't. And it will cost when you get to wherever you are going. Travel, as we all know, isn't getting any less expensive.

Lower income people aren't about to give up their cars, trucks or SUVs.  That's a luxury for politically correct upper middle class people. Lower income people -- if that's where Democratic Party sympathies lie -- will not be riding high-speed rail.

Which is to say that the Democratic Party support for this train is highly contradictory and runs totally against Democratic Party ideology.  And for that, the Party will be punished this November.

The Democratic agenda totally ignores the on-the-ground realities behind high-speed rail. HSR is not public mass transit; it's no more "green" than other current transit modalities. And these modalities, like driving and flying, are being upgraded rapidly to be far more economical and fuel efficient. The outcomes of this trend are already visible in reduced national gasoline consumption.

It ought to be clear by now that there is no altruistic agenda behind the Democratic support for  HSR.  Our Party leaders are not doing us any favors.

The project in California, as advocated by the Governor and the Legislature, is totally self-serving, and on many levels, including career and resume benefits, profits, power, and political control.  As we like to say on this blog, it's not about the train at all; it's about the process.  And that means, getting and spending huge amounts of money.

I never thought I would think or say it, but my Democratic representatives deserve to lose this election if they don't relinquish this shameless charade.

Saturday, May 5, 2012

When it comes to High-Speed Rail, they can't hear us.


Grandchildren visiting are taking priority over blogging.  Until end of the week, there will be less activity on this blog.

Yet, reading the daily papers re-affirms a saying about which I am convinced, coined by the American writer Upton Sinclair:

"It is difficult to get a man to understand something, when his salary depends on his not understanding it."

What that means for us is that there really is no point in trying to convince anyone related to the CHSRA or the Democratic Party in California that what they believe, or say they believe, is incorrect.  

Democratic Party elected officials, starting with Governor Jerry Brown, depend upon Union campaign funding, today more than ever.

The facts and realities of this high-speed rail project are totally irrelevant.

The Construction Union's rank-and-file have a greater unemployment rate than most other Unions.  Furthermore, Unions are under heavy fire from the Republicans in many states and are fighting for their very existence.  That puts the burden on the Democratic Party regulars to offer as much support as possible. (I'm pro-Union, by the way, but what is going on here is the striking of very bad bargains.)

For reasons of their own, since those are not congruent with the truth or reality, these Unions believe that federal and state funding for the construction of this high-speed rail project will provide zillions of permanent, wonderful, well-paying jobs.  At least, that's their mantra for those members now unemployed.

The Governor is eager/desperate for those $3.5 billion in federal funding to come to California and will continue to promote the HSR project that is the basis for obtaining those funds. His salary depends on it, so to speak. The same is true for all the other Democrats in the Legislature, many of whom are determined to obtain some of those funds for their Districts.

Needless to say, Chairman Dan Richard has personal ambitions, including financial ones, of his own as he represents the rail authority with endless verbal distortions, as does Mike Rossi and all the other Board members.

So, as we watch this debacle unfold in California, we can be sure that all our entreaties are of no avail. They fall on deaf ears. I wish my colleagues on the Peninsula would come to that same conclusion, and had come to it far earlier.

Why? Because a far more confrontational and adversarial agenda had been and continues to be called for.  Persuasion is not the name of this game. Neither is accommodation or compromise, a favored tactic of most politicians, as they seek to have it "both ways."

That is not possible. It has never been possible.  There's an old, stupid joke about hitting a mule on the head with a 2X4 in order to get his attention so that instructions can be whispered in his ear.  In our context, that's not such a stupid joke, however.  For us, lawsuits are such 2X4s.  

We need to hit both Caltrain and the rail authority on the head with lawsuits to get their attention.  Nothing less will have any effect.  And they do continue to provide us with ample opportunities to sue them.

Friday, May 4, 2012

When it comes to High-Speed Rail, they can't hear us.


Grandchildren visiting are taking priority over blogging.  Until end of the week, there will be less activity on this blog.

Yet, reading the daily papers re-affirms a saying of which I am fond, coined by the American writer Upton Sinclair: 

"It is difficult to get a man to understand something, when his salary depends on his not understanding it."

What that means for us is that there really is no point in trying to convince anyone related to the CHSRA or the Democratic Party in California that what they believe, or say they believe, is incorrect.

The facts and realities of this high-speed rail project are totally irrelevant.  Yes, this project is terrible and in so many ways that the list becomes book-length. 

That's what William Gindley and Mark Powell and Ken Orski and Wendell Cox, the CC-HSR and the CARRD groups,  and the LA Times and the Sacramento Bee, and even the New York Times and the Washington Post have been trying to tell us. Nonetheless, the people who make decisions, the Democrats, cannot hear them.  

Democratic Party elected officials, starting with Governor Jerry Brown, depend upon Union campaign funding, today more than ever. 

The Construction Union's rank-and-file have a greater unemployment rate than most other Unions.  Furthermore, Unions are under heavy fire from the Republicans in many states and are fighting for their very existence.  

That puts the burden on the Democratic Party regulars to offer as much support as possible. And that's where their support comes from. It assures their jobs.  It's like their salaries.

For reasons of their own, since those are not congruent with the truth or reality, these Unions believe that federal and state funding for the construction of this high-speed rail project will provide zillions of permanent, wonderful, well-paying jobs.  At least, that's their mantra for those unemployed.

(I'm pro-Union, by the way, but what is going on is the striking of very bad bargains. All those promised jobs will not magically appear.)

The Governor is eager/desperate for those $3.5 billion in federal funding to come to California and will continue to promote the HSR project that is the basis for obtaining those funds. His salary depends on it, so to speak. 

The same is true for all the other Democrats in the Legislature, many of whom are determined to obtain some of those funds for their Districts. 

Needless to say, Chairman Dan Richard has personal ambitions, including financial ones, of his own as he represents the rail authority with endless verbal distortions, as does Rossi and all the other Board members. 

Keep in mind the enormous power of an organization that gets to spend billions on many hundreds of contractors. What do the facts have to do with this? They can't hear us.

So, as we watch this debacle unfold in California, we can be sure that all our entreaties are of no avail. They fall on deaf ears. I wish my colleagues on the Peninsula would come to that same conclusion, and had come to it far earlier.

Why? Because a far more confrontational agenda had been and continues to be called for.  Persuasion is not the name of this game. Neither is accommodation or compromise, a favored tactic of most politicians, as they seek to have it "both ways." 

That is not possible. It has never been possible.  There's an old, stupid joke about hitting a mule on the head with a 2X4 in order to get his attention so that instructions can be whispered in his ear. In our context, that's not such a stupid joke, however.  

For us, lawsuits are such 2X4s.  We need to hit both Caltrain and the rail authority on the head with lawsuits to get their attention.  Nothing less will have any effect.  And they continue to provide us with ample opportunities to sue them.